监控杆如何进行预埋件的安装
来源: | 作者:pmoe85d8b | 发布时间: 2018-08-02 | 1972 次浏览 | 分享到:
监控杆的使用是为了提高了城市安全防范,使居民生活的有效保障。那么监控杆如何进行安装呢?下面小编就为大家讲解下。监控杆的基础施工一般分为,浇筑式,和预制式的两种,但是两种预埋的方式,各有利弊,浇筑的方式对于整个基座的固定和稳固是非常好的.但是由于施工现场的各个点位的情况不同,有时候点位之间的距离非常的远,来回跑动的话,对于施工的进度和成本影响非常大,这时候预制的基础底座就很有效的解决了这样的问题,预制的基础底座也是采用混凝土加钢筋笼浇注。
The use of the monitoring rod is to improve the security of the city and ensure the effective protection of residents' lives. How to install the monitor rod? I'm going to explain it to you. Control rod foundation construction generally divided into, pouring, and prefabricated type two kinds, but two embedded ways, each have advantages and disadvantages, casting the way to the base fixed and stable is very good. But due to the construction site of each point is different, sometimes the distance between the point very far, back and forth, for the construction schedule and cost impact is very big, then prefabricated foundation base is very effective to solve such problems, base is the basis of precast concrete and steel reinforcement cage.

监控杆

监控立杆的预埋件基础施工:
Monitoring the construction of the embedded parts of the pole foundation:

基础的钢筋笼应临时固定,同时确保钢筋宠的基础顶板平面水平,即用水平尺在基础顶板垂直两个方向测量,观察其气泡必须居中;监控立杆预埋件基础混凝土浇捣必须密实,禁止混凝土有空鼓;施工时要在预埋管口预先用塑料纸或其它材料封口,以防止混凝土浇捣时混凝土漏入预埋管中,造成预埋管堵塞;基础浇捣后,基础面必须要高于地平面5MM~10MM;混凝土必须要养护一段时间,以确保混凝土能达到一定的安装强度。
The reinforcement cage of the foundation shall be temporarily fixed, and the plane of the top plate of the foundation shall be ensured at the same time. The foundation concrete grouting of the monitoring rod embedded parts must be compacted and free concrete drum is prohibited. Plastic paper or other materials should be used to seal the opening of the embedded pipe in advance during construction to prevent the concrete from leaking into the embedded pipe during concrete pouring and tamping, thus causing the embedded pipe to be blocked. After the foundation is pounded, the foundation surface must be 5MM ~ 10MM above the ground surface. The concrete must be maintained for some time to ensure that the concrete can reach a certain installation strength.

每一根金属立杆都必须接地,其接地电阻小于4欧;各立杆基础具体数据视现场施工需要为准。
Every metal pole must be grounded, and its ground resistance is less than 4 euros. The specific data of each vertical bar foundation shall be subject to the on-site construction requirements.

路口窨井施工:
Crossroads cellar construction:

道路监控立杆一般只要求使用小规格窨井,为了设备安装方便窨井宜设置在监控杆附近;当地下水位不高时,窨井井底只铺砾石(沙子)垫层,以便雨天在窨井中积水渗入地下,但井壁下则须有混凝土基础垫层,井壁粉水泥沙浆;当地下水位很高时,窨井井底加一层10CM的混凝土垫层,井壁和井底要粉刷防水沙浆;净尺寸500×500×600(长×宽×高),采用Mu10砖M5水泥沙浆240厚砌筑,盖板用Φ8@150双向配置C20砼预制板厚为60厚,标高同人行道面或绿化带,板面须光滑,设提孔,按国标制作盖板。各窨井土建具体数据视现场施工需要为准。
In general, the road monitoring vertical pole only requires the use of small size inspection Wells, in order to facilitate installation of equipment, it is advisable to set up inspection Wells near the monitoring rods; When the local water level is not high, the bottom of the cellar well is only paved with gravel (sand) cushion layer, so that the rainwater can infiltrate into the ground in rainy days. When the local water level is high, a layer of 10CM concrete cushion is added to the bottom of the cellar well. Net size is 500 * 500 * 600 (length x width x height), using 240 thick masonry cement mortar M5 Mu10 brick, cover with Φ 8 @ 150 two-way configuration for 60 thick C20 concrete precast slab thickness, level with the pavement surface or green belts, board face should be smooth, set DiKong, according to the national standard production of cover plate. The concrete data of each cellar well construction shall be subject to the needs of site construction.

以上就是小编为大家整理提供的内容,希望对大家在安装监控杆的时候有所帮助。
The above is the content provided by the editor for you to sort out, hoping to help you when installing the monitor bar.

   

相关新闻

NEWS
   
  • 铝合金监控立杆厂家定制的说明书

    2025-04-06

    1552

    铝合金监控立杆的技术说明及应用
    1. 产品概述

    铝合金监控杆是以高强度铝合金材料(如6061、6063等)制成的监控杆,主要用于安装监控摄像头、交通信号灯、太阳能板等设备。其轻量化、耐腐蚀的特性使其成为传统钢制杆的优质替代品。
    2. 铝合金监控杆核心特点与优势

    轻量化:密度仅为钢的1/3,便于运输和安装,降低施工成本。

    耐腐蚀:天然氧化层防锈,适合沿海、高湿度等恶劣环境,寿命可达20年以上。

    强度高:铝合金经热处理后抗拉强度高,可抗8-10级大风。

    美观性:表面可阳极氧化或喷涂,颜色多样(如银色、黑色),造型现代简洁。

    环保节能:可100%回收,无污染,部分型号支持太阳能供电集成。

  • 仿真松树监控立杆的制作流程及优点

    2025-03-16

    941

    仿真松树监控立杆制作流程包括设计规划,根据安装环境确定尺寸、形状、颜色,设计监控设备安装位置及布线方案;选用玻璃钢、树脂等耐久材料及仿真材料;制作模具塑造树干、树枝;将材料注入模具成型后脱模并组装;喷涂颜色纹理、添加仿生细节;在预定位置安装立杆并调试监控设备;定期维护确保结构和设备正常。其优点有隐蔽性强、美观性高、耐久性好、环保、多功能性、安全性高,通过逼真外观和隐蔽性既保护环境又满足监控需求,适用于多种场所

  • 不锈钢监控杆比普通监控杆的10大优点

    2025-03-16

    903

    使用不锈钢监控杆相比普通监控杆有10大优点,包括耐腐蚀性强,适合恶劣环境;使用寿命长;强度高,能承受更大外力;维护成本低;外观美观,适合景观要求高的场所;可100%回收,符合环保要求;能在极端温度下保持性能稳定;安装简便,节省人力时间;抗紫外线,不易老化变色;防盗性能好,回收价值低。这些优点使其在多种场景更具优势

  • 监控立杆的设计抗风性能要求及参数计算,举例6米立杆顶部在8级风中的位移数据

    2025-03-16

    1462

    监控立杆的设计抗风性能是确保其在强风环境下稳定运行的关键,包括抗风性能要求、参数计算及6米立杆在8级风中的位移数据示例。抗风性能要求方面,设计风速依当地气象数据确定,监控立杆应承受8级风以上风力,高风区需达12级,立杆材料用Q235或Q345钢材,6米立杆壁厚不小于4mm,基础采用混凝土基础且深度不小于1.5米。参数计算涉及风荷载、立杆弯矩和位移计算。以6米立杆在8级风上限风速20m/s为例,计算得出顶部位移约5.5mm,在允许范围内,说明立杆设计满足抗风要求。设计建议包括选用高强度钢材、增加壁厚或直径、优化结构、加固基础等,以确保监控立杆在强风环境下的安全性和稳定性

  • 室外监控立杆的防雷注意事项及规范,加工监控立杆配套的避雷针要求 开启新对话

    2025-03-16

    1675

    室外监控立杆防雷设计是确保设备安全运行的重要环节,包含防雷注意事项、规范及避雷针要求。防雷注意事项有配备接地电阻小于10Ω的接地系统,立杆等金属部件做等电位连接,在立杆顶部装高于监控设备的避雷针,电源线和信号线穿金属管或用屏蔽线并装防雷器,立杆与地面做好绝缘处理,定期检查防雷设施。防雷规范需遵循相关国家标准,接地电阻一般小于10Ω,按滚球法计算避雷针保护范围,电源和信号防雷器按标准和信号类型选型。避雷针加工要求采用不锈钢或热镀锌钢材,直径不小于12mm,垂直安装并与立杆牢固连接,按滚球法计算保护范围,通过铜缆或镀锌扁钢与接地系统连接,表面光滑防腐。施工前检查材料,施工确保连接可靠,验收时测接地电阻,检查安装位置、高度、保护范围及防雷器和线路防护措施,以此降低雷击风险,保障设备安全稳定运行

  • 监控立杆及基础施工方案详细流程及规范

    2025-03-16

    1572

    监控立杆及基础施工方案是确保监控设备稳定运行的重要环节,其详细施工流程及规范如下:施工准备包括现场勘察确定立杆位置、检查地下管线,准备符合要求的材料和施工设备;基础施工需放线定位、开挖基坑、绑扎基础钢筋、安装预埋件、浇筑混凝土并养护;立杆安装要吊装立杆、固定立杆、安装设备;验收调试需检查立杆、基础及设备情况并调试监控和照明设备;采取安全与环保措施,施工人员佩戴防护用品、设置警示标志,控制污染、清理现场;施工要遵循设计、材料、施工工艺和验收规范,以保障施工质量和设备稳定运行。